Wednesday, July 4, 2007

t-17 hours

Today was a great day. Tomorrow promises to be even better. The beautiful weather is supposed to hold through the weekend, and we ended today with 10 of 16 posts standing. Tomorrow morning after baking we will help prepare the remaining posts (and arches), and drill holes in the slab for the brackets to help hold the posts. Then, in the afternoon, a crane truck will arrive to lift the purlins up on to the posts, then place the 34 6x10 rafters up on top of the purlins for later placement. By the end of tomorrow afternoon, the bakery structure will basically be in place!

Tuesday, July 3, 2007

done, done, done, done, dome!

The dome of the wood oven is finished. Now all that needs doing is the chimney, the cladding, the insulation, the facade, etc. Some of these things won't get done right away, but we would like the oven usable fairly soon. The second photo shows the vent in the back side of the dome that will join with the main exhaust pipe coming from the side of the oven below the slab. We placed three thermocouples in the dome to help us when we are learning how to operate the oven efficiently.

Friday, June 29, 2007

it's that time again

Today is the day before the Farmer's Market. It seems that I now measure my week by the market. Sunday is "recover from market day", Thursday is "start resting for market day", and so on. It's lunch time, and it's raining. We got two more rows of dome bricks layed out, but we need more mortar. This afternoon will be spent prepping for tomorrow morning. The dome only needs a half day of work to be finished, then we can clad the outside of the dome with a layer of refractory fondu cement mixed with some more stainless steel needles. After that, the first fire won't be too far off!

Monday, June 25, 2007

growing a dome

Our wood oven dome grew by three rows today. It is amazing the difference a few bricks can make. It feels like we are making some progress again, now that the dome is going up. Paul and i figure we should be able to finish the dome with one more solid days of cutting and mortaring. The lower photo is the view through the bake door.

Friday, June 22, 2007

minor change of plans

Nothing major, but we figured that since we'll likely have heat to spare, we'd get into the bath house business as well. We're going to have an assortment of "traditional" baths, all heated by the wood fired oven. People will be able to enjoy a relaxing soak in the tub and a warm scone at the same time.

We've now stuck down the first row of bricks for the dome, and are waiting for a friend's brick saw before continuing. We also borrowed a couple of scaffolding stages, and I took a panoramic photo of the building site (there are a couple of glitches, so I'll try to get a better one after the rain stops). It is once again the day before the market, and this afternoon will be spent prepping for the long night and day ahead. Hopefully the rain clears by tomorrow morning :)

Monday, June 18, 2007

movin' on up

Today Paul & I stuck down the perimeter hearth bricks, and brought down the two door frames to decide on how we want to mount them. The one that is upper center is the door we will put the bread in/out through. The actual door part is obviously not there for the photo. We have a few more plywood forms to cut for the dome, and we want to install the doors before starting on the dome.

Thursday, June 14, 2007

hearth! hearth!

Today we (mostly Paul) managed to lay the bricks forming the baking surface of the oven. They need some minor adjustments before we can stick the outer few layers of bricks together, but that should be finished tomorrow. Then we can start putting up the forms for the dome, as well as installing the beautiful doors we had made.

Oh yeah, and Billy was busy working on posts and arch templates. Here's a photo of a pretty much completed post waiting to be erected permanently (insert your own joke here, I'm too tired).

Monday, June 4, 2007

posts are up!

OK, maybe "posts are up" is a bit strong. Two posts were up temporarily so that the bottom ends could be scribed and cut to fit the foundation. One of them is still standing.

We'll probably start moving on the oven again in the next couple of days, laying the hearth bricks.

Monday, May 28, 2007

back in business

More work on the purlins today. We began notching what will be the bottoms of the purlins where they will sit on the posts.

This morning Paul & I built the slab for the oven. It is full of small stainless steel needles that are mixed into the refractory cement to provide strength to the suspended portions of the slab. The randomness of the needles provides fewer places that the slab would be likely to crack along than using rebar or mesh. Next comes a layer of fire bricks which will become our baking surface.