Monday, November 16, 2009
Oven Repairs Under Way
On Sunday we took apart the inside portion of the fire box (top photo). Today we built the form for the new wall of the fire box, poured it, and prepared the two pieces that will sit on top of the wall, and the small slab that will become the new ceiling of the box. The ceiling will have a ceramic blanket placed between it and the underside of the main slab of the oven. Tomorrow we're going to build some block work in front of the fire box to create a more solid attachment point for the fire box door. The blocks and door will also be insulated from the main firebox by a gasket of ceramic fiber blanket.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment