Friday, April 27, 2007

completed slab

As promised, here is a photo of the completed slab, after the tarp was removed today. It rained most of the day, which is apparently great for the concrete, as it absorbs the water and gains strength faster than curing without extra water. Not much to do now until it is strong enough to support a few loads of bricks.

Thursday, April 26, 2007

the slab has landed

The bakery now has a floor. And almost all the work we have done so far will never be seen again. A concrete finishing crew from Nanaimo came over today and poured the slab. It went amazingly quick, until they had to wait between passes with the power trowel. They weren't completely done until around 7pm. It does look pretty great though. It went from this:


To this:

This is after about 4 passes with the power trowel (sitting on the slab). They did about 6 or 7 all together. I'll post a tarpless slab pic tomorrow.

Tuesday, April 24, 2007

good to go

Quick post tonight. It's late, and I'm tired.

The engineer came by this morning and gave us the go ahead to pour the slab. We finished up preparing the foundation, then as a bonus converted our borrowed boat trailer into a slab hauling machine. A "slab" is an off-cut edge piece leftover from the log milling process. We are planning to collect slabs, cut them, and use them to fire the bake oven.


Monday, April 23, 2007

"S" minus 3 days and counting

I thought today would be a slow day. I was planning to do a bit of work on the trailer we are going to use for hauling firewood. The day soon turned into a busy one. Pay attention now, this gets confusing....

The slab is scheduled to be poured on Thursday. We still needed more sand. We need to place rebar on top of the finished sand. The engineer needs to inspect the rebar before the concrete is poured, but he can only make it tomorrow. In short, we need to have the rebar ready for inspection tomorrow morning, and we are still short of sand.

So we start getting rebar ready, and leveling the sand where we think there is enough. The sand arrives in the afternoon, and we work until almost 7pm finishing the rear of the bakery, so it is ready for inspection. We'll get an early start tomorrow, and hopefully have most of it finished before the engineer arrives.

The photo shows the bakery foundation, partially finished, with the sand packed and leveled, covered with vapor barrier, and with the reinforcing wire mesh on the plastic. As mentioned before, the depression in the rear middle is where the concrete slab has to be thicker to support the weight of the oven. The thickened slab is reinforced with a grid of 15mm rebar.

Saturday, April 21, 2007

done with the sand!

WRONG.
Believe it or not, we still need more sand. Just a couple of inches across the front of the foundation, but the thought of another dump truck coming is getting a bit depressing. The thought of having a finished slab by the end of the week more than makes up for it though. The depression in the sand where the compactor is sitting is where the slab has to be thicker to support the weight of the oven.

Now, if only this stomach flu would go away.

Friday, April 20, 2007

can you guess what we did today?


If you said "I bet Paul and Dimitri moved mountains" , then right you are. Two more dump trucks of sand appeared and disappeared into the foundation. I swear the loads of sand are getting bigger each time. We had a great surprise when Matt stopped by to kill some of his spare time by shoveling sand! Thanks tons Matt. The bad news is that we're not done just yet. The good news is that we only need about half a truck, and it is coming tomorrow morning. As long as we get some nice weather, we should have a slab sometime this coming week!

Thursday, April 19, 2007

sand

Sand. Sand. Sand.

We started our day off by leveling the sand left over from yesterday. We squeezed in a full 5 minutes of rest before Gordy showed up with the compactor, and back to work we went.

Lunch.

Two more truck loads of sand are delivered, and we start all over again. Shoveling, wheelbarrowing, and dumping. Over, and over, and over. The front right corner of the foundation needed some extra stabilization with all the sand being packed in, but Paul was up to the task. Raena and Rosie helped with the compacting. The kids will be pretty sad when their giant sandbox finally gets covered in concrete.





























Whats on tomorrow's agenda you ask? Sand.

Wednesday, April 18, 2007

got a shovel? come on down!

3 dump trucks of fill, 1 dump truck of drain rock, and 2 dump trucks of sand.

That is what we dealt with today. The outside of the left side of the foundation was back-filled this morning, then the drain rock was dumped, and we spent a good part of the day spreading it around the foundation with shovels and wheelbarrows. With that done, I thought a quick dip in the hot tub and a cold beer was in order.

Then came the sand. One truck load dumped inside the foundation. We must have been pretty impressive moving that pile, because Gordy decided to bring us another load right away. So we have two truck loads of sand to level out in the left side of the bakery, then we can compact it, then comes several more trucks full of sand until the foundation is full, and ready for the slab to be poured on top.

Saturday, April 14, 2007

we are now up to date (or at least you are)


okay. Here is my most recent photo of the bakery. The foundation walls have been painted, the drainage pipe is in place, and we have dumped as much spare (waste) concrete debris in the hole as we could find. Now we wait. I suppose if we get bored enough we could spend several hours picking up used nails.